Search

Home

About

Profile
People
Clients
Operating Philosophy
History
Careers at Rollalong

News

Press Releases
Photo Library

Products & Services

Product Range
Markets
Case Studies
Purchase Options
Cabins Stock List

Support

Product Warranty
Support Services
FAQs
Links

Contacts

 

 

Contact Details
Email us
Map

 

 

 

 


Case Study

Client: Lackham College Campus, Nr Chippenham, Wiltshire

Project: Lackham College, Sports Changing Facility

Need: Replacement of an existing shower/changing block to provide larger facility for the College’s increasingly busy sporting calendar.

Solution: A 54 sq metre portable building was constructed to provide two changing rooms, each containing their own shower and toilet areas and a bespoke changing room for match officials, which also doubles as a disabled toilet facility.

The building was designed with high specification internal finishes and is clad in impact resistant durable colour coated steel.

Rollalong won the contract through a solutions led approach and flexibility in design.

Duration: The changing facility took just 6 weeks to manufacture.