Case Study

Client: Joint Services Unit at Northwood, the MOD operating through WS Atkins Defence Estates

Project: JSU Northwood, Single Living Accommodation, Phase 2

Need: To provide quality single living accommodation for 256 service personnel to replace redundant living quarters and reduce the need for off-site accommodation provision.

Solution: A three storey temporary modular building was provided. The building provides an additional 256 bedrooms for defence personnel and includes communal areas such as laundry and television rooms.

Each bedroom is fully furnished with a single bed, wardrobes, drawers and a desk. The room also contains it’s own en-suite bathroom comprising of a pedestal sink, wc and shower.

Externally finished in stone cladding, the turnkey project included all mechanical and electrical work, landscaping the grounds, external groundworks and services such as path lighting. Internally, the building was supplied fully furnished including the provision of televisions, laundry equipment and fire equipment such as fire extinguishers. As with previously supplied accommodation Phase 2 was linked into an existing Building Management System.

The building was manufactured in Rollalong’s quality controlled factory, including the internal fit out and installation of all mechanical and electrical services prior to delivery to site, erection and connection to mains services.

Duration: The contract was secured late November 2001 and the building was handed over just 4.5 months later.